/archive link=https://github.com/fullsizemalt/morethanadiagnosis-hub/pull/1 Complete the OpenSpec lifecycle for all four baseline proposals: - Architecture Baseline → approved and applied - Privacy & Compliance Baseline → approved and applied - Accessibility Baseline → approved and applied - Wix Migration Plan → approved and applied All proposals marked as archived with PR traceability. OpenSpec lifecycle complete: propose → review → apply → archive ✓
1.3 KiB
1.3 KiB
Proposal: Wix Migration Plan (Inventory → Import)
Status: archived Archived: 2025-11-17 Merged PR: https://github.com/fullsizemalt/morethanadiagnosis-hub/pull/1 Authors: Data & Content Teams Owners: Data Lead, Content Lead Created: 2025-11-17 Scope: spec Related: openspec/specs/migration-wix.md
Summary
- Inventory current Wix content/data and define export, transform, validate, and import processes with rollback.
Motivation
- Achieve a seamless, auditable migration to the new hub with stable redirects and high content fidelity.
Goals / Non-Goals
- Goals: data inventory, mapping, transforms, validation, import jobs, verification, rollback.
- Non-Goals: content rewriting or re-branding.
Requirements
- Functional: idempotent import jobs; redirects; link integrity checks.
- Accessibility: content formatting that preserves semantic structure.
- Privacy & Compliance: classify fields; ensure consent and retention policies.
Migration / Rollout Plan
- Follow steps in
openspec/specs/migration-wix.mdwith dry-runs and sign-offs.
Test Plan
- Sample-based verification; automated link checks; duplicate/redirect detection.
Acceptance Criteria
- Successful dry-run; sign-off from stakeholders; archived logs and mapping.
Slash Commands
/review areas=data,compliance/apply spec=openspec/specs/migration-wix.md/archive link=<PR>