📦 Shopping List Feature (Phase 3A) - Full SupplyItem model with Vendor & ProductUrl - Shopping List / Inventory toggle - Add Item Modal (Category, Thresholds, Vendor info) - 'Order Now' external link logic - 'Mark Ordered' tracking - Quantity +/- adjustments 📅 Roadmap Update: - Defined Unified Master Calendar (Phase 4) - Added granular toggles (Emp Schedules, Taxes, Compliance, Plant Cycle, etc.) 🚀 Status: - Backend deployed (Schema synced) - Frontend deploying...
9.4 KiB
777 Wolfpack Grow Ops Manager - Complete Roadmap
Version: 0.2.0
Last Updated: 2025-12-09
Team: 777 Wolfpack
✅ PHASE 1: FOUNDATION (COMPLETE)
Sprint 1: Infrastructure ✅
- Backend health checks
- Database setup (PostgreSQL + Prisma)
- Docker deployment
- Traefik routing
- Redis integration
Sprint 2: Authentication & RBAC ✅
- JWT authentication (access + refresh tokens)
- Bcrypt password hashing
- User roles (OWNER, MANAGER, GROWER, STAFF)
- Login/logout
- Protected routes
Sprint 2.5: Mobile-First UI ✅
- Space Grotesk font (premium typography)
- Emerald & Slate color scheme
- SVG icons (Lucide React)
- Smooth animations
- Dark/Light/Auto theme toggle
- Touch-optimized (44px+ targets)
- Accessibility (WCAG 2.1 AA)
✅ PHASE 1.5: DAILY WALKTHROUGH (COMPLETE)
Database Schema ✅
- DailyWalkthrough model
- ReservoirCheck (4 tanks)
- IrrigationCheck (4 zones)
- PlantHealthCheck (4 zones)
- 5 enums for status tracking
Backend API ✅
- 7 endpoints (CRUD + checks)
- JWT authentication
- User attribution
- Error handling
Frontend UI ✅
- Start screen with 777 Wolfpack branding
- Reservoir checklist (visual tank indicators)
- Irrigation checklist (dripper tracking)
- Plant health checklist (pest monitoring)
- Summary/review screen
- Complete integration
Status: ✅ DEPLOYED & WORKING
🔄 PHASE 2: CORE OPERATIONS (IN PROGRESS)
2.1: Plant Touch Points & IPM Tracking
Priority: 🔴 Critical
Estimated: 17 hours (2-3 days)
Features:
- Touch point recording (every plant interaction)
- Touch types: Watering, Feeding, Pruning, Training, Inspection, IPM, Transplanting, Harvesting
- IPM schedule tracking (10-day root drench cycles)
- Pyganic 5.0 product tracking
- Photo documentation
- Alerts for IPM treatments
Database:
- PlantTouchPoint model
- IPMSchedule model
- TouchPointType enum
Spec: specs/plant-touch-points-ipm.md
2.2: Photo Management & Storage
Priority: 🔴 Critical
Estimated: 7-11 hours
Features:
- Client-side compression (WebP, 80% quality)
- Server-side multi-size generation (thumb/medium/full)
- 85-90% storage reduction
- Local storage with daily backups
- 7-year retention for CA compliance
Tech:
- Sharp for server-side processing
- browser-image-compression for client-side
- 3 sizes: 200px, 800px, 1920px
Spec: specs/photo-management.md
2.3: Grow Room Heatmap
Priority: 🟡 High
Estimated: 12-15 hours
Features:
- Visual heat-map of plant health
- 2-level room layout (floor_1, floor_2)
- Color-coded health scores (0-100)
- Hover tooltips with bed details
- Sensor data overlay (temp, humidity, EC, PAR)
- SVG-based grid rendering
Components:
- GrowRoomHeatmap (main)
- FloorGrid (SVG grid)
- BedCell (individual beds)
- BedTooltip (hover details)
- FloorToggle (floor selector)
- HealthLegend (color scale)
Spec: specs/grow-room-heatmap.md
📦 PHASE 3: INVENTORY & MATERIALS
Priority: 🟡 High
Estimated: 30-40 hours (1-2 weeks)
Features
Item Catalog
- Nutrients (base, additives, supplements)
- Growing media (soil, coco, rockwool)
- Pots and containers
- IPM products (pesticides, beneficial insects)
- PPE (gloves, masks, suits)
- CO₂ tanks and regulators
- Filters (carbon, HEPA)
- Packaging (jars, bags, labels)
- Tools and equipment
Inventory Tracking
- Add stock (deliveries with lot and cost)
- Use stock (with batch linkage)
- Adjust stock (with reason and approval)
- Transfer stock (between locations)
- Automatic updates (future: task completion)
Restock Alerts
- Min threshold alerts
- Expiration alerts
- Restock suggestions (usage trends)
Lot/Serial Tracking
- Link lots to batches (traceability)
- Recall support (query batches by lot)
- Supplier traceability
Supplier Management
- Supplier database
- Contact information
- Performance tracking
- Purchase order history
Shopping List
- Low stock report
- Restock suggestions
- Cost estimates
- Supplier recommendations
Reporting
- Current inventory
- Low stock report
- Usage report (by item, batch, period)
- Cost report (per batch)
- Expiration report
Database:
- InventoryItem model
- InventoryLot model
- InventoryTransaction model
- BatchMaterialLink model
- Supplier model
- ItemCategory enum
- TransactionType enum
Spec: specs/inventory-and-materials.md
📅 PHASE 4: TASKS & SCHEDULING
Priority: 🟡 High
Estimated: 25-35 hours
Features
- Unified Master Calendar:
- Toggles for:
- Employee Schedules (Rooster)
- Vacation Requests
- Shift/Hours Logs
- Vendor Deliveries/Meetings
- Plant Cycle (Veg/Flower/Harvest dates)
- Tax Schedule (Deadlines)
- Compliance Matters (Inspections, renewals)
- Toggles for:
- Task templating & assignment
- Automatic stock deduction
- Batch lifecycle integration
- Notifications and reminders
Database:
- CalendarEvent model
- EventType enum (SCHEDULE, VACATION, VENDOR, PLANT, TAX, COMPLIANCE)
- Task model
- TaskTemplate model
- TaskAssignment model
Spec: specs/tasks-and-scheduling.md
🌱 PHASE 5: ADVANCED BATCH LIFECYCLE
Priority: 🟢 Medium
Estimated: 20-30 hours
Features
- Batch creation and tracking
- Growth stage management
- Yield tracking and analytics
- Batch notes and observations
- Batch-to-batch comparisons
- Harvest scheduling
- Waste tracking
Database:
- Enhanced Batch model
- BatchStage enum
- BatchNote model
- YieldRecord model
Spec: specs/batches-and-rooms.md
📱 PHASE 6: PWA & MOBILE
Priority: 🟢 Medium
Estimated: 10-15 hours
Features
- Service worker (offline support)
- Web manifest (Android APK)
- Install prompt for Android users
- Offline data sync
- Push notifications
- Background sync
- App icons (192px, 512px)
Status: ⏳ Manifest created, service worker pending
📊 PHASE 7: REPORTING & ANALYTICS
Priority: 🟢 Medium
Estimated: 20-25 hours
Features
- Dashboard with key metrics
- Batch performance analytics
- Cost analysis
- Yield predictions
- Environmental trends
- Labor efficiency
- Export to PDF/Excel
🔔 PHASE 8: COMMUNICATIONS & NOTIFICATIONS
Priority: 🟢 Medium
Estimated: 15-20 hours
Features
- In-app notifications
- Email notifications
- SMS alerts (critical issues)
- Slack integration
- Discord integration
- Notification preferences
- Alert escalation
Spec: specs/communications-and-notifications.md
📋 PHASE 9: COMPLIANCE & DOCUMENTATION
Priority: 🟢 Medium
Estimated: 25-30 hours
Features
- Compliance checklists
- Document management
- Audit trail
- Regulatory reporting
- Certificate tracking
- Inspection readiness
- Export compliance reports
Spec: specs/compliance-and-docs.md
🔌 PHASE 10: INTEGRATIONS & HARDWARE
Priority: 🔵 Low
Estimated: 30-40 hours
Features
- Environmental sensors (temp, humidity, CO₂)
- Irrigation controllers
- Lighting controllers
- Security cameras
- Access control
- HVAC integration
- Real-time monitoring
Spec: specs/integrations-and-hardware.md
🎯 QUICK WINS (Can be done anytime)
Error Handling
- ErrorBoundary component
- 404 page
- Network error handling
- Form validation
- API error messages
UI Polish
- Loading skeletons
- Empty states
- Success animations
- Error animations
- Toast notifications
Performance
- Code splitting
- Lazy loading
- Image optimization
- API caching
- Database indexing
📊 ESTIMATED TIMELINE
| Phase | Status | Estimated Time | Priority |
|---|---|---|---|
| Phase 1: Foundation | ✅ Complete | - | - |
| Phase 1.5: Daily Walkthrough | ✅ Complete | - | - |
| Phase 2: Core Operations | 🔄 In Progress | 36-41 hours | 🔴 Critical |
| Phase 3: Inventory | 📋 Spec'd | 30-40 hours | 🟡 High |
| Phase 4: Tasks & Scheduling | 📋 Spec'd | 25-35 hours | 🟡 High |
| Phase 5: Advanced Batches | 📋 Spec'd | 20-30 hours | 🟢 Medium |
| Phase 6: PWA & Mobile | ⏳ Started | 10-15 hours | 🟢 Medium |
| Phase 7: Reporting | 📋 Spec'd | 20-25 hours | 🟢 Medium |
| Phase 8: Communications | 📋 Spec'd | 15-20 hours | 🟢 Medium |
| Phase 9: Compliance | 📋 Spec'd | 25-30 hours | 🟢 Medium |
| Phase 10: Integrations | 📋 Spec'd | 30-40 hours | 🔵 Low |
Total Remaining: ~211-276 hours (~5-7 weeks at 40 hours/week)
🎯 RECOMMENDED NEXT STEPS
Immediate (This Week)
- ✅ Complete Phase 2.1: Touch Points & IPM
- ✅ Complete Phase 2.2: Photo Management
- ✅ Complete Phase 2.3: Grow Room Heatmap
Short-term (Next 2 Weeks)
- ✅ Complete Phase 6: PWA & Mobile
- ✅ Start Phase 3: Inventory & Materials
Medium-term (Next Month)
- ✅ Complete Phase 3: Inventory
- ✅ Complete Phase 4: Tasks & Scheduling
- ✅ Start Phase 5: Advanced Batches
Long-term (2-3 Months)
- ✅ Complete Phases 7-9 (Reporting, Communications, Compliance)
- ✅ Evaluate Phase 10 (Integrations & Hardware)
📝 NOTES
- All specs are complete and ready for implementation
- Database schemas are designed
- API endpoints are defined
- UI components are outlined
- Mobile-first approach throughout
- 777 Wolfpack branding consistent
- Accessibility compliance (WCAG 2.1 AA)
Status: Phase 1 & 1.5 complete. Phase 2 in progress. Ready to accelerate! 🚀