# Quick Implementation Plan - Priority Features
**Date**: 2025-12-09
**Focus**: Get core features working ASAP
---
## 🎯 **IMMEDIATE PRIORITIES** (Next 2-3 Days)
### 1. Fix Walkthrough Error (NOW)
**Time**: 30 minutes
**Status**: ✅ DONE
**Action**: Fixed controller empty body crash and unified routing.
---
### 2. Shopping List / Facility Supplies (PHASE 3A)
**Time**: 8-12 hours (1-2 days)
**Priority**: 🔴 CRITICAL
#### What You'll Get
- Item catalog (filters, toilet paper, cleaning supplies, PPE, etc.)
- Current inventory levels
- **Shopping list** (items below min threshold)
- Quick "Add to Shopping List" button
- Mark items as "Ordered" or "Received"
#### Implementation
**Database** (1 hour):
```prisma
model SupplyItem {
id String @id @default(cuid())
name String
category SupplyCategory
quantity Int
minThreshold Int
unit String
location String?
lastOrdered DateTime?
notes String?
}
enum SupplyCategory {
FILTER
CLEANING
PPE
OFFICE
BATHROOM
KITCHEN
MAINTENANCE
OTHER
}
```
**Backend API** (2 hours):
- `GET /api/supplies` - List all items
- `GET /api/supplies/shopping-list` - Items below threshold
- `POST /api/supplies` - Add item
- `PATCH /api/supplies/:id` - Update quantity
- `POST /api/supplies/:id/order` - Mark as ordered
**Frontend UI** (5-7 hours):
- Supplies page with grid/list view
- Shopping list page (filtered view)
- Quick add form
- Quantity adjustment (+/- buttons)
- "Add to Shopping List" button
- "Mark as Ordered" button
**Total**: 8-10 hours
---
### 3. Touch Points (PHASE 2.1)
**Time**: 12-15 hours (2 days)
**Priority**: 🟡 HIGH
#### What You'll Get
- Quick "Log Touch Point" button
- Touch types: Water, Feed, Prune, Train, Inspect, IPM
- Photo upload
- Notes
- History view per batch
#### Implementation
**Database** (1 hour):
- PlantTouchPoint model (already designed)
**Backend API** (3 hours):
- `POST /api/touch-points` - Log touch point
- `GET /api/touch-points` - List with filters
- `GET /api/batches/:id/touch-points` - Batch history
**Frontend UI** (8-11 hours):
- Quick log modal (mobile-optimized)
- Touch type selector (big buttons)
- Photo capture
- Batch selector
- History timeline
- Filter by type/date
**Total**: 12-15 hours
---
### 4. Task Lists (PHASE 4A - SIMPLIFIED)
**Time**: 6-8 hours (1 day)
**Priority**: 🟡 HIGH
#### What You'll Get
- Simple task list (no scheduling yet)
- Create task
- Assign to user
- Mark complete
- Filter by status
#### Implementation
**Database** (30 min):
```prisma
model Task {
id String @id @default(cuid())
title String
description String?
assignedTo String?
status TaskStatus
dueDate DateTime?
completedAt DateTime?
createdBy String
}
enum TaskStatus {
TODO
IN_PROGRESS
DONE
}
```
**Backend API** (2 hours):
- `GET /api/tasks` - List tasks
- `POST /api/tasks` - Create task
- `PATCH /api/tasks/:id` - Update task
- `DELETE /api/tasks/:id` - Delete task
**Frontend UI** (3-5 hours):
- Task list page
- Create task modal
- Task cards with status
- Filter by status/assignee
- Mark complete button
**Total**: 6-8 hours
---
## 📊 **TOTAL EFFORT FOR ALL 3**
| Feature | Time | Priority |
|---------|------|----------|
| Shopping List | 8-12 hours | 🔴 Critical |
| Touch Points | 12-15 hours | 🟡 High |
| Task Lists | 6-8 hours | 🟡 High |
| **TOTAL** | **26-35 hours** | **3-5 days** |
---
## 🚀 **RECOMMENDED APPROACH**
### Day 1 (Today)
- ✅ Fix walkthrough error
- ✅ Deploy mobile bottom nav
- 🔄 Start Shopping List (database + backend)
### Day 2
- ✅ Complete Shopping List (frontend)
- ✅ Test and deploy
- 🔄 Start Touch Points (database + backend)
### Day 3
- ✅ Complete Touch Points (frontend)
- ✅ Test and deploy
- 🔄 Start Task Lists (database + backend)
### Day 4
- ✅ Complete Task Lists (frontend)
- ✅ Test and deploy
- ✅ Polish and bug fixes
### Day 5
- ✅ User testing with 777 Wolfpack team
- ✅ Gather feedback
- ✅ Plan next features
---
## 💡 **QUICK WINS**
If you want something working TODAY:
### Shopping List MVP (4 hours)
- Just the database and basic CRUD
- Simple list view
- Add/remove items
- Mark as "Need to Order"
- **Deploy by end of day**
### Touch Points MVP (6 hours)
- Just log touch points (no photos)
- Simple form
- History view
- **Deploy tomorrow**
---
## ✅ **WHAT'S ALREADY DONE**
- ✅ All specs written
- ✅ Database schemas designed
- ✅ API endpoints defined
- ✅ UI mockups described
- ✅ Mobile-first foundation
- ✅ Authentication & RBAC
- ✅ Daily Walkthrough
**We're 80% of the way there - just need to build it!**
---
**Status**: Ready to implement. Just say which feature to start with! 🚀