6 KiB
6 KiB
CA Grow Ops Manager - Spec Kit Compliance Audit
Audit Date: December 17, 2025
Auditor: AI Assistant
App Version: 0.3.0 (main branch)
Executive Summary
This audit reviews the CA Grow Ops Manager against the defined specification documents to assess feature completeness, demo functionality, and documentation coverage.
Session Fixes Applied (Dec 17):
- ✅ DevTools account switcher now navigates to dashboard
- ✅ Role names unified (STAFF/GROWER instead of WORKER/CULTIVATOR)
- ✅ Documents page TRAINING type crash fixed
- ✅ Documents category field references removed (aligned with schema)
- ✅ Filter dropdowns updated to match backend types
Spec Coverage Matrix
Core Specifications (/specs/)
| Spec File | Status | Frontend | Backend | Demo Data | Notes |
|---|---|---|---|---|---|
daily-walkthrough.md |
✅ Complete | ✅ | ✅ | ✅ 30 days | Now shows "completed" status |
batches-and-rooms.md |
✅ Complete | ✅ | ✅ | ✅ 7 batches, 8 rooms | |
plant-touch-points-ipm.md |
✅ Complete | ✅ | ✅ | ✅ IPM schedules | |
facility-3d-viewer.md |
✅ Demo Mode | ✅ | ✅ Data seeded | ✅ 21 sections, 648 positions | React Three Fiber fixed |
visitor-management.md |
✅ Complete | ✅ | ✅ | 🔲 Minimal | Kiosk + management pages |
compliance-and-docs.md |
✅ Complete | ✅ | ✅ | ✅ 9 documents | SOP Library fixed Dec 17 |
tasks-and-scheduling.md |
✅ Complete | ✅ | ✅ | ✅ 7 tasks | |
labor-and-hours.md |
✅ Complete | ✅ | ✅ | ✅ 14 days | Timeclock page |
inventory-and-materials.md |
✅ Complete | ✅ | ✅ | ✅ 12 items | Supplies page |
photo-management.md |
⚠️ Partial | ✅ Upload UI | ✅ | 🔲 | Photo compression, no demo photos |
metrc-integration.md |
✅ Dashboard | ✅ Dashboard | ✅ Routes | 🔲 Demo mode | Added Dec 17 - CSV export, audit |
paperless-integration.md |
🔲 Spec Only | 🔲 | 🔲 | 🔲 | Future integration |
hardware-integration.md |
🔲 Spec Only | 🔲 | 🔲 | 🔲 | Sensors, etc. |
communications-and-notifications.md |
⚠️ Partial | ✅ Announcements | ✅ | ✅ 3 announcements | No push/email |
integrations-and-hardware.md |
🔲 Spec Only | 🔲 | 🔲 | 🔲 | |
advanced-features.md |
⚠️ Partial | ✅ Dashboards | ✅ | 🔲 | Env/Finance/Insights mock |
audit-and-documents.md |
✅ Complete | ✅ Pages | ✅ | ✅ 15 entries | Fixed Dec 17 |
messaging.md |
⚠️ Partial | 🔲 | ✅ Routes exist | 🔲 | Backend ready |
accessibility-i18n.md |
⚠️ Partial | ✅ i18n setup | N/A | N/A | Skip link, basic a11y |
grow-room-heatmap.md |
✅ Complete | ✅ | Mock | 🔲 | Visual component done |
Documentation Status (/docs/)
| Document | Purpose | Status |
|---|---|---|
architecture.md |
System architecture | ✅ Up to date |
ROADMAP.md |
Feature roadmap | ✅ Updated v0.3.0 |
openapi.yaml |
API documentation | ⚠️ Partial |
DESIGN-SYSTEM-LINEAR.md |
UI/UX guidelines | ✅ Complete |
compliance-notes-ca.md |
CA regulations | ✅ Reference |
Phase plans (PHASE-*.md) |
Sprint planning | ✅ Historical |
| Session summaries | Work tracking | ✅ Maintained |
Critical Items Needing Attention
1. SOP Library (/compliance/documents)
Issue: Page exists but demo data may not fully demonstrate functionality
Action Required:
- Verify SOPs display correctly
- Add more diverse document types
- Test document viewing
2. Audit Log (/compliance/audit)
Issue: Page exists but may need more demo entries
Action Required:
- Verify audit entries display
- Add sample entries for various action types
- Test filtering/search
3. 3D Facility Viewer
Issue: Spec created, data seeded, but no 3D visualization component yet
Action Required:
- Spec document created
- Install React Three Fiber
- Seed facility positions (648 positions)
- Facility 3D Viewer: ✅ Complete (Demo Mode with seeded plants)
- Integrate with layout API
4. Layout Designer
Issue: Complex drag-drop tool has API issues, consider simplifying
Action Required:
- Fixed double /api prefix
- Consider replacing with simpler dimension-input form
- Focus on 3D viewer vs. designer
Demo Data Summary
✅ Seeded Demo Data:
├── 5 Users (admin, manager, growers, workers)
├── 8 Rooms (Veg, Flower, Dry, Cure, Mother)
├── 7 Batches (various stages: clone, veg, flower, dry, cure)
├── ~292 Touch Points (50/batch average)
├── 30 Days Walkthrough History
├── 9 SOP Documents
├── 12 Supply Items
├── 7 Tasks
├── IPM Schedules (per active batch)
├── Weight Logs (for dried batches)
├── 3 Announcements
├── 14 Days Time Punch History
└── Facility Structure:
├── 1 Property (777 Wolfpack Cultivation)
├── 2 Buildings
├── 3 Floors
├── 8 Facility Rooms
├── 21 Sections (tables/racks)
└── 648 Plant Positions
Recommendations
Immediate (This Session)
- ✅
Walkthrough "completed today" indicator - ⚠️ Verify SOP Library displaying seeded data
- ⚠️ Verify Audit Log displaying entries
- 🔲 Start basic 3D Viewer component
Short-term
- Add more Audit Log demo entries
- Complete 3D Facility Viewer
- Update ROADMAP.md
- Expand OpenAPI documentation
Medium-term
- METRC integration (Phase 2)
- Paperless-ngx integration
- Push notifications
- Hardware sensor integration
Compliance Score
| Category | Score | Max |
|---|---|---|
| Core Operations | 18 | 20 |
| Compliance Features | 6 | 10 |
| Visualization | 4 | 10 |
| Integrations | 2 | 10 |
| Documentation | 8 | 10 |
| Demo Data | 9 | 10 |
| Total | 47 | 70 |
Overall Compliance: 67% - Good foundation, key features complete, visualization/integrations pending.
Last Updated: December 12, 2025