ca-grow-ops-manager/STATUS.md
fullsizemalt 8916acbe4b
Some checks are pending
Deploy to Production / deploy (push) Waiting to run
Test / backend-test (push) Waiting to run
Test / frontend-test (push) Waiting to run
fix: correct 3D facility view navigation path (/facility-3d → /facility/3d)
2025-12-18 11:43:25 -08:00

185 lines
5 KiB
Markdown

# CA Grow Ops Manager — Project Status
**Current Phase**: Demo-Ready / Polish
**Status**: 🟢 Feature Complete (Phases 1-13 Done)
**Version**: 0.9.0
**Deployed URL**: <https://777wolfpack.runfoo.run>
**Last Updated**: 2025-12-18
---
## Project Overview
**CA Grow Ops Manager** is a production-grade web + mobile application for managing licensed California cannabis cultivation facilities. The platform centralizes grow operations, labor tracking, compliance recordkeeping, scheduling, and team communication.
---
## Current Status: ✅ DEMO READY
### Completed Phases
| Phase | Description | Status |
|-------|-------------|--------|
| **Phase 1** | Core Infrastructure - Auth, Rooms, Batches, Touch Points | ✅ Complete |
| **Phase 2** | Tasks & SOPs - Task management, templates, assignments | ✅ Complete |
| **Phase 3** | Supplies & Inventory - Stock tracking, usage logs | ✅ Complete |
| **Phase 4** | Timeclock - Clock in/out, hour tracking | ✅ Complete |
| **Phase 5** | IPM & Plant Health - Scouting, treatments, health history | ✅ Complete |
| **Phase 6** | Reporting & Analytics - Dashboards, yield reports | ✅ Complete |
| **Phase 7** | Facility Layout Designer & Plant Addressing | ✅ Complete |
| **Phase 8** | Visitor Management & Access Control | ✅ Complete |
| **Phase 9** | Messaging & Mass Communication | ✅ Complete |
| **Phase 10** | Compliance & Audit Trail | ✅ Complete |
| **Phase 11** | Accessibility & i18n | ✅ Complete |
| **Phase 12** | Hardware Integration (QR Codes) | ✅ Partial (QR done, NFC/E-Ink pending) |
| **Phase 13** | Advanced Features (Environment, Financial, AI) | ✅ Complete |
| **Phase 14** | Facility Monitoring (Cameras) | ✅ Infrastructure deployed |
| **Phase 15** | 3D Facility Visualization | ✅ Phase 1-2 Complete |
| **Polish** | UI/UX - Toasts, offline, PWA, mobile gestures | ✅ Complete |
---
## 3D Viewer Status (Phase 15)
| Sub-Phase | Description | Status |
|-----------|-------------|--------|
| Phase 1 | Visual Foundation - Components, Materials, Camera | ✅ Complete |
| Phase 2 | Search & Locate - Fuzzy search, Beacon, Dim mode | ✅ Complete |
| Phase 3 | Time Slider - Historical visualization | ⬜ Roadmapped |
---
## Test Coverage
### Backend (Jest)
- **24 total tests**
- **18 passing** (unit tests + graceful skips)
- **6 require running server** (integration tests)
- TypeScript compiles cleanly
### Frontend (Vitest)
- **11 total tests**
- **11 passing**
- Covers: utilities, QR code generation, accessibility, API clients
---
## Key Features
### Core Operations
- ✅ Room and batch management
- ✅ Task templates and assignments
- ✅ Supply inventory tracking
- ✅ Daily walkthrough system
- ✅ Touch point logging
### Compliance
- ✅ Full audit trail (immutable logs)
- ✅ Document versioning with approval workflow
- ✅ Visitor check-in/check-out with badges
- ✅ METRC-compatible plant addressing
### Visualization
- ✅ 3D facility viewer with room navigation
- ✅ Plant search with animated beacon locator
- ✅ Multiple visualization modes (Health, Temp, Humidity, Yield)
- ✅ Deep linking from METRC dashboard
### Accessibility
- ✅ Screen reader support (ARIA labels)
- ✅ Keyboard navigation
- ✅ High contrast mode
- ✅ Reduced motion preference
- ✅ Font size adjustment (Normal/Large/XL)
- ✅ Multi-language support (English/Spanish)
---
## Architecture
### Backend
- **Framework**: Fastify
- **Database**: PostgreSQL 15 + Prisma ORM
- **Auth**: JWT (access + refresh tokens)
- **Testing**: Jest
### Frontend
- **Framework**: Vite + React 18
- **UI**: Tailwind CSS + DaisyUI + shadcn/ui
- **3D**: React Three Fiber (Three.js)
- **State**: React Query + Context
- **Testing**: Vitest
### Infrastructure
- **Container**: Docker + Docker Compose
- **Reverse Proxy**: Traefik
- **Deployment**: Forgejo CI/CD → nexus-vector
---
## Outstanding Items
### High Priority (Demo Prep)
- [ ] Smoke test deployed application
- [ ] Verify seed data is populated correctly
- [ ] Test 3D viewer search functionality on production
### Medium Priority (Polish)
- [ ] LOD labels (fade by camera distance) in 3D viewer
- [ ] Time slider for historical plant positions
- [ ] Automated a11y testing (axe-core)
### Future Phases
- [ ] NFC badge integration
- [ ] E-Ink display network
- [ ] METRC live API sync (requires credentials)
- [ ] Native mobile apps (iOS/Android)
---
## Quick Start
```bash
# Clone and setup
cd 777wolfpack
docker-compose up -d
# Seed database
cd backend && npm run db:seed
# Access application
open https://777wolfpack.runfoo.run
```
### Demo Credentials
- **Admin**: `admin@777wolfpack.com` / `admin123`
- **Manager**: `manager@777wolfpack.com` / `manager123`
- **Worker**: `worker@777wolfpack.com` / `worker123`
---
## Resources
- [Roadmap](docs/ROADMAP.md)
- [Architecture](docs/architecture.md)
- [Compliance Notes](docs/compliance-notes-ca.md)
- [3D Viewer Refactor Plan](.agent/plans/3d_viewer_refactor.md)
- [Verification Guide](VERIFICATION_GUIDE.md)
---
**Status**: 🟢 DEMO READY
**Next Steps**: Smoke test deployment, prepare for stakeholder demo