feat: add audit log demo data + spec kit compliance audit
- Added 15 audit log entries demonstrating various actions
- Created SPEC-KIT-AUDIT.md documenting feature completeness
- Actions: LOGIN, CREATE, UPDATE, DELETE, ACCESS, EXPORT, APPROVE
2025-12-12 22:21:11 -08:00

168 lines
5.6 KiB
Markdown

# CA Grow Ops Manager - Spec Kit Compliance Audit
**Audit Date:** December 12, 2025
**Auditor:** AI Assistant
**App Version:** Latest (main branch)
---
## Executive Summary
This audit reviews the CA Grow Ops Manager against the defined specification documents to assess feature completeness, demo functionality, and documentation coverage.
---
## Spec Coverage Matrix
### Core Specifications (`/specs/`)
| Spec File | Status | Frontend | Backend | Demo Data | Notes |
|-----------|--------|----------|---------|-----------|-------|
| `daily-walkthrough.md` | ✅ Complete | ✅ | ✅ | ✅ 30 days | Now shows "completed" status |
| `batches-and-rooms.md` | ✅ Complete | ✅ | ✅ | ✅ 7 batches, 8 rooms | |
| `plant-touch-points-ipm.md` | ✅ Complete | ✅ | ✅ | ✅ IPM schedules | |
| `facility-3d-viewer.md` | 🔲 Spec Only | 🔲 | ✅ Data seeded | ✅ 21 sections, 648 positions | React Three Fiber installed |
| `visitor-management.md` | ✅ Complete | ✅ | ✅ | 🔲 Minimal | Kiosk + management pages |
| `compliance-and-docs.md` | ⚠️ Partial | ⚠️ | ⚠️ | ⚠️ | SOP/Audit need demo data |
| `tasks-and-scheduling.md` | ✅ Complete | ✅ | ✅ | ✅ 7 tasks | |
| `labor-and-hours.md` | ✅ Complete | ✅ | ✅ | ✅ 14 days | Timeclock page |
| `inventory-and-materials.md` | ✅ Complete | ✅ | ✅ | ✅ 12 items | Supplies page |
| `photo-management.md` | ⚠️ Partial | ✅ Upload UI | ✅ | 🔲 | Photo compression, no demo photos |
| `metrc-integration.md` | ⚠️ Spec Only | 🔲 | 🔲 | 🔲 | Placeholder for future |
| `paperless-integration.md` | 🔲 Spec Only | 🔲 | 🔲 | 🔲 | Future integration |
| `hardware-integration.md` | 🔲 Spec Only | 🔲 | 🔲 | 🔲 | Sensors, etc. |
| `communications-and-notifications.md` | ⚠️ Partial | ✅ Announcements | 🔲 | ✅ 3 announcements | No push/email |
| `integrations-and-hardware.md` | 🔲 Spec Only | 🔲 | 🔲 | 🔲 | |
| `advanced-features.md` | ⚠️ Partial | ✅ Dashboards | ✅ | 🔲 | Env/Finance/Insights mock |
| `audit-and-documents.md` | ⚠️ Partial | ✅ Pages | ⚠️ | ⚠️ | Need more demo data |
| `messaging.md` | 🔲 Not Started | 🔲 | 🔲 | 🔲 | |
| `accessibility-i18n.md` | ⚠️ Partial | ✅ i18n setup | N/A | N/A | Skip link, basic a11y |
| `grow-room-heatmap.md` | ✅ Complete | ✅ | Mock | 🔲 | Visual component done |
---
## Documentation Status (`/docs/`)
| Document | Purpose | Status |
|----------|---------|--------|
| `architecture.md` | System architecture | ✅ Up to date |
| `ROADMAP.md` | Feature roadmap | ⚠️ Needs update |
| `openapi.yaml` | API documentation | ⚠️ Partial |
| `DESIGN-SYSTEM-LINEAR.md` | UI/UX guidelines | ✅ Complete |
| `compliance-notes-ca.md` | CA regulations | ✅ Reference |
| Phase plans (`PHASE-*.md`) | Sprint planning | ✅ Historical |
| Session summaries | Work tracking | ✅ Maintained |
---
## Critical Items Needing Attention
### 1. SOP Library (`/compliance/documents`)
**Issue:** Page exists but demo data may not fully demonstrate functionality
**Action Required:**
- [ ] Verify SOPs display correctly
- [ ] Add more diverse document types
- [ ] Test document viewing
### 2. Audit Log (`/compliance/audit`)
**Issue:** Page exists but may need more demo entries
**Action Required:**
- [ ] Verify audit entries display
- [ ] Add sample entries for various action types
- [ ] Test filtering/search
### 3. 3D Facility Viewer
**Issue:** Spec created, data seeded, but no 3D visualization component yet
**Action Required:**
- [x] Spec document created
- [x] Install React Three Fiber
- [x] Seed facility positions (648 positions)
- [ ] Build Facility3DViewer component
- [ ] Integrate with layout API
### 4. Layout Designer
**Issue:** Complex drag-drop tool has API issues, consider simplifying
**Action Required:**
- [x] Fixed double /api prefix
- [ ] Consider replacing with simpler dimension-input form
- [ ] Focus on 3D viewer vs. designer
---
## Demo Data Summary
```
✅ Seeded Demo Data:
├── 5 Users (admin, manager, growers, workers)
├── 8 Rooms (Veg, Flower, Dry, Cure, Mother)
├── 7 Batches (various stages: clone, veg, flower, dry, cure)
├── ~292 Touch Points (50/batch average)
├── 30 Days Walkthrough History
├── 9 SOP Documents
├── 12 Supply Items
├── 7 Tasks
├── IPM Schedules (per active batch)
├── Weight Logs (for dried batches)
├── 3 Announcements
├── 14 Days Time Punch History
└── Facility Structure:
├── 1 Property (777 Wolfpack Cultivation)
├── 2 Buildings
├── 3 Floors
├── 8 Facility Rooms
├── 21 Sections (tables/racks)
└── 648 Plant Positions
```
---
## Recommendations
### Immediate (This Session)
1.~~Walkthrough "completed today" indicator~~
2. ⚠️ Verify SOP Library displaying seeded data
3. ⚠️ Verify Audit Log displaying entries
4. 🔲 Start basic 3D Viewer component
### Short-term
1. Add more Audit Log demo entries
2. Complete 3D Facility Viewer
3. Update ROADMAP.md
4. Expand OpenAPI documentation
### Medium-term
1. METRC integration (Phase 2)
2. Paperless-ngx integration
3. Push notifications
4. Hardware sensor integration
---
## Compliance Score
| Category | Score | Max |
|----------|-------|-----|
| Core Operations | 18 | 20 |
| Compliance Features | 6 | 10 |
| Visualization | 4 | 10 |
| Integrations | 2 | 10 |
| Documentation | 8 | 10 |
| Demo Data | 9 | 10 |
| **Total** | **47** | **70** |
**Overall Compliance: 67%** - Good foundation, key features complete, visualization/integrations pending.
---