Added PlantTouchPoint and IPMSchedule models. Implemented touch-points and IPM controllers/routes. Updated frontend with Dashboard feed and IPM widgets.
463 lines
9.7 KiB
Markdown
463 lines
9.7 KiB
Markdown
# 777 Wolfpack Grow Ops Manager - Complete Roadmap
|
|
|
|
**Version**: 0.2.0
|
|
**Last Updated**: 2025-12-09
|
|
**Team**: 777 Wolfpack
|
|
|
|
---
|
|
|
|
## ✅ **PHASE 1: FOUNDATION** (COMPLETE)
|
|
|
|
### Sprint 1: Infrastructure ✅
|
|
|
|
- Backend health checks
|
|
- Database setup (PostgreSQL + Prisma)
|
|
- Docker deployment
|
|
- Traefik routing
|
|
- Redis integration
|
|
|
|
### Sprint 2: Authentication & RBAC ✅
|
|
|
|
- JWT authentication (access + refresh tokens)
|
|
- Bcrypt password hashing
|
|
- User roles (OWNER, MANAGER, GROWER, STAFF)
|
|
- **Granular Permissions (Custom Roles)** ✅
|
|
- Login/logout
|
|
- Protected routes
|
|
|
|
### Sprint 2.5: Mobile-First UI ✅
|
|
|
|
- Space Grotesk font (premium typography)
|
|
- Emerald & Slate color scheme
|
|
- SVG icons (Lucide React)
|
|
- Smooth animations
|
|
- Dark/Light/Auto theme toggle
|
|
- Touch-optimized (44px+ targets)
|
|
- Accessibility (WCAG 2.1 AA)
|
|
- **Granular Navigation (Roles/Settings)** ✅
|
|
|
|
---
|
|
|
|
## ✅ **PHASE 1.5: DAILY WALKTHROUGH** (COMPLETE)
|
|
|
|
### Database Schema ✅
|
|
|
|
- DailyWalkthrough model
|
|
- WalkthroughSettings model (Configurable logic) ✅
|
|
- ReservoirCheck (4 tanks)
|
|
- IrrigationCheck (4 zones)
|
|
- PlantHealthCheck (4 zones)
|
|
- 5 enums for status tracking
|
|
|
|
### Backend API ✅
|
|
|
|
- 7 endpoints (CRUD + checks)
|
|
- Settings API (Dynamic Configuration) ✅
|
|
- JWT authentication
|
|
- User attribution
|
|
- Error handling
|
|
|
|
### Frontend UI ✅
|
|
|
|
- Start screen with 777 Wolfpack branding
|
|
- Reservoir checklist (visual tank indicators)
|
|
- Irrigation checklist (dripper tracking)
|
|
- Plant health checklist (pest monitoring)
|
|
- **Admin Settings Page (Photo Requirements/Toggles)** ✅
|
|
- Summary/review screen
|
|
- Complete integration
|
|
|
|
**Status**: ✅ **DEPLOYED & WORKING**
|
|
|
|
---
|
|
|
|
## 🔄 **PHASE 2: CORE OPERATIONS** (IN PROGRESS)
|
|
|
|
### 2.1: Plant Touch Points & IPM Tracking
|
|
|
|
**Priority**: 🔴 Critical
|
|
**Estimated**: 17 hours (2-3 days)
|
|
|
|
**Features**:
|
|
|
|
- Touch point recording (every plant interaction)
|
|
- Touch types: Watering, Feeding, Pruning, Training, Inspection, IPM, Transplanting, Harvesting
|
|
- IPM schedule tracking (10-day root drench cycles)
|
|
- Pyganic 5.0 product tracking
|
|
- Photo documentation
|
|
- Alerts for IPM treatments
|
|
|
|
**Database**:
|
|
|
|
- PlantTouchPoint model
|
|
- IPMSchedule model
|
|
- TouchPointType enum
|
|
|
|
**Spec**: `specs/plant-touch-points-ipm.md`
|
|
|
|
---
|
|
|
|
### 2.2: Photo Management & Storage
|
|
|
|
**Priority**: 🔴 Critical
|
|
**Estimated**: 7-11 hours
|
|
|
|
**Features**:
|
|
|
|
- Client-side compression (WebP, 80% quality)
|
|
- Server-side multi-size generation (thumb/medium/full)
|
|
- 85-90% storage reduction
|
|
- Local storage with daily backups
|
|
- 7-year retention for CA compliance
|
|
|
|
**Tech**:
|
|
|
|
- Sharp for server-side processing
|
|
- browser-image-compression for client-side
|
|
- 3 sizes: 200px, 800px, 1920px
|
|
|
|
**Spec**: `specs/photo-management.md`
|
|
|
|
---
|
|
|
|
### 2.3: Grow Room Heatmap
|
|
|
|
**Priority**: 🟡 High
|
|
**Estimated**: 12-15 hours
|
|
|
|
**Features**:
|
|
|
|
- Visual heat-map of plant health
|
|
- 2-level room layout (floor_1, floor_2)
|
|
- Color-coded health scores (0-100)
|
|
- Hover tooltips with bed details
|
|
- Sensor data overlay (temp, humidity, EC, PAR)
|
|
- SVG-based grid rendering
|
|
|
|
**Components**:
|
|
|
|
- GrowRoomHeatmap (main)
|
|
- FloorGrid (SVG grid)
|
|
- BedCell (individual beds)
|
|
- BedTooltip (hover details)
|
|
- FloorToggle (floor selector)
|
|
- HealthLegend (color scale)
|
|
|
|
**Spec**: `specs/grow-room-heatmap.md`
|
|
|
|
---
|
|
|
|
## 📦 **PHASE 3: INVENTORY & MATERIALS**
|
|
|
|
**Priority**: 🟡 High
|
|
**Estimated**: 30-40 hours (1-2 weeks)
|
|
|
|
### Features
|
|
|
|
#### Item Catalog
|
|
|
|
- Nutrients (base, additives, supplements)
|
|
- Growing media (soil, coco, rockwool)
|
|
- Pots and containers
|
|
- IPM products (pesticides, beneficial insects)
|
|
- PPE (gloves, masks, suits)
|
|
- CO₂ tanks and regulators
|
|
- Filters (carbon, HEPA)
|
|
- Packaging (jars, bags, labels)
|
|
- Tools and equipment
|
|
|
|
#### Inventory Tracking
|
|
|
|
- Add stock (deliveries with lot and cost)
|
|
- Use stock (with batch linkage)
|
|
- Adjust stock (with reason and approval)
|
|
- Transfer stock (between locations)
|
|
- Automatic updates (future: task completion)
|
|
|
|
#### Restock Alerts
|
|
|
|
- Min threshold alerts
|
|
- Expiration alerts
|
|
- Restock suggestions (usage trends)
|
|
|
|
#### Lot/Serial Tracking
|
|
|
|
- Link lots to batches (traceability)
|
|
- Recall support (query batches by lot)
|
|
- Supplier traceability
|
|
|
|
#### Supplier Management
|
|
|
|
- Supplier database
|
|
- Contact information
|
|
- Performance tracking
|
|
- Purchase order history
|
|
|
|
#### Shopping List
|
|
|
|
- Low stock report
|
|
- Restock suggestions
|
|
- Cost estimates
|
|
- Supplier recommendations
|
|
|
|
#### Reporting
|
|
|
|
- Current inventory
|
|
- Low stock report
|
|
- Usage report (by item, batch, period)
|
|
- Cost report (per batch)
|
|
- Expiration report
|
|
|
|
**Database**:
|
|
|
|
- InventoryItem model
|
|
- InventoryLot model
|
|
- InventoryTransaction model
|
|
- BatchMaterialLink model
|
|
- Supplier model
|
|
- ItemCategory enum
|
|
- TransactionType enum
|
|
|
|
**Spec**: `specs/inventory-and-materials.md`
|
|
|
|
---
|
|
|
|
## 📅 **PHASE 4: TASKS & SCHEDULING**
|
|
|
|
**Priority**: 🟡 High
|
|
**Estimated**: 25-35 hours
|
|
|
|
### Features
|
|
|
|
- **Unified Master Calendar**:
|
|
- Toggles for:
|
|
- Employee Schedules (Rooster)
|
|
- Vacation Requests
|
|
- Shift/Hours Logs
|
|
- Vendor Deliveries/Meetings
|
|
- Plant Cycle (Veg/Flower/Harvest dates)
|
|
- Tax Schedule (Deadlines)
|
|
- Compliance Matters (Inspections, renewals)
|
|
- Task templating & assignment
|
|
- Automatic stock deduction
|
|
- Batch lifecycle integration
|
|
- Notifications and reminders
|
|
|
|
**Database**:
|
|
|
|
- CalendarEvent model
|
|
- EventType enum (SCHEDULE, VACATION, VENDOR, PLANT, TAX, COMPLIANCE)
|
|
- Task model
|
|
- TaskTemplate model
|
|
- TaskAssignment model
|
|
|
|
**Spec**: `specs/tasks-and-scheduling.md`
|
|
|
|
---
|
|
|
|
## 🌱 **PHASE 5: ADVANCED BATCH LIFECYCLE**
|
|
|
|
**Priority**: 🟢 Medium
|
|
**Estimated**: 20-30 hours
|
|
|
|
### Features
|
|
|
|
- Batch creation and tracking
|
|
- Growth stage management
|
|
- Yield tracking and analytics
|
|
- Batch notes and observations
|
|
- Batch-to-batch comparisons
|
|
- Harvest scheduling
|
|
- Waste tracking
|
|
|
|
**Database**:
|
|
|
|
- Enhanced Batch model
|
|
- BatchStage enum
|
|
- BatchNote model
|
|
- YieldRecord model
|
|
|
|
**Spec**: `specs/batches-and-rooms.md`
|
|
|
|
---
|
|
|
|
## 📱 **PHASE 6: PWA & MOBILE**
|
|
|
|
**Priority**: 🟢 Medium
|
|
**Estimated**: 10-15 hours
|
|
|
|
### Features
|
|
|
|
- Service worker (offline support)
|
|
- Web manifest (Android APK)
|
|
- Install prompt for Android users
|
|
- Offline data sync
|
|
- Push notifications
|
|
- Background sync
|
|
- App icons (192px, 512px)
|
|
|
|
**Status**: ⏳ Manifest created, service worker pending
|
|
|
|
---
|
|
|
|
## 📊 **PHASE 7: REPORTING & ANALYTICS**
|
|
|
|
**Priority**: 🟢 Medium
|
|
**Estimated**: 20-25 hours
|
|
|
|
### Features
|
|
|
|
- Dashboard with key metrics
|
|
- Batch performance analytics
|
|
- Cost analysis
|
|
- Yield predictions
|
|
- Environmental trends
|
|
- Labor efficiency
|
|
- Export to PDF/Excel
|
|
|
|
---
|
|
|
|
## 🔔 **PHASE 8: COMMUNICATIONS & NOTIFICATIONS**
|
|
|
|
**Priority**: 🟢 Medium
|
|
**Estimated**: 15-20 hours
|
|
|
|
### Features
|
|
|
|
- In-app notifications
|
|
- Email notifications
|
|
- SMS alerts (critical issues)
|
|
- Slack integration
|
|
- Discord integration
|
|
- Notification preferences
|
|
- Alert escalation
|
|
|
|
**Spec**: `specs/communications-and-notifications.md`
|
|
|
|
---
|
|
|
|
## 📋 **PHASE 9: COMPLIANCE & DOCUMENTATION**
|
|
|
|
**Priority**: 🟢 Medium
|
|
**Estimated**: 25-30 hours
|
|
|
|
### Features
|
|
|
|
- Compliance checklists
|
|
- Document management
|
|
- Audit trail
|
|
- Regulatory reporting
|
|
- Certificate tracking
|
|
- Inspection readiness
|
|
- Export compliance reports
|
|
|
|
**Spec**: `specs/compliance-and-docs.md`
|
|
|
|
---
|
|
|
|
## 🔌 **PHASE 10: INTEGRATIONS & HARDWARE**
|
|
|
|
**Priority**: 🔵 Low
|
|
**Estimated**: 30-40 hours
|
|
|
|
### Features
|
|
|
|
- Environmental sensors (temp, humidity, CO₂)
|
|
- Irrigation controllers
|
|
- Lighting controllers
|
|
- Security cameras
|
|
- Access control
|
|
- HVAC integration
|
|
- Real-time monitoring
|
|
|
|
**Spec**: `specs/integrations-and-hardware.md`
|
|
|
|
---
|
|
|
|
## 🎯 **QUICK WINS** (Can be done anytime)
|
|
|
|
### Error Handling
|
|
|
|
- ErrorBoundary component
|
|
- 404 page
|
|
- Network error handling
|
|
- Form validation
|
|
- API error messages
|
|
|
|
### UI Polish
|
|
|
|
- Loading skeletons
|
|
- Empty states
|
|
- Success animations
|
|
- Error animations
|
|
- Toast notifications
|
|
|
|
### Performance
|
|
|
|
- Code splitting
|
|
- Lazy loading
|
|
- Image optimization
|
|
- API caching
|
|
- Database indexing
|
|
|
|
---
|
|
|
|
## 📊 **ESTIMATED TIMELINE**
|
|
|
|
| Phase | Status | Estimated Time | Priority |
|
|
|-------|--------|----------------|----------|
|
|
| Phase 1: Foundation | ✅ Complete | - | - |
|
|
| Phase 1.5: Daily Walkthrough | ✅ Complete | - | - |
|
|
| Phase 2: Core Operations | 🔄 In Progress | 36-41 hours | 🔴 Critical |
|
|
| Phase 3: Inventory | 📋 Spec'd | 30-40 hours | 🟡 High |
|
|
| Phase 4: Tasks & Scheduling | 📋 Spec'd | 25-35 hours | 🟡 High |
|
|
| Phase 5: Advanced Batches | 📋 Spec'd | 20-30 hours | 🟢 Medium |
|
|
| Phase 6: PWA & Mobile | ⏳ Started | 10-15 hours | 🟢 Medium |
|
|
| Phase 7: Reporting | 📋 Spec'd | 20-25 hours | 🟢 Medium |
|
|
| Phase 8: Communications | 📋 Spec'd | 15-20 hours | 🟢 Medium |
|
|
| Phase 9: Compliance | 📋 Spec'd | 25-30 hours | 🟢 Medium |
|
|
| Phase 10: Integrations | 📋 Spec'd | 30-40 hours | 🔵 Low |
|
|
|
|
**Total Remaining**: ~211-276 hours (~5-7 weeks at 40 hours/week)
|
|
|
|
---
|
|
|
|
## 🎯 **RECOMMENDED NEXT STEPS**
|
|
|
|
### Immediate (This Week)
|
|
|
|
1. ✅ Complete Phase 2.1: Touch Points & IPM
|
|
2. ✅ Complete Phase 2.2: Photo Management
|
|
3. ✅ Complete Phase 2.3: Grow Room Heatmap
|
|
|
|
### Short-term (Next 2 Weeks)
|
|
|
|
4. ✅ Complete Phase 6: PWA & Mobile
|
|
5. 🔄 Complete Phase 3: Inventory & Materials (Shopping List MVP Done)
|
|
|
|
### Medium-term (Next Month)
|
|
|
|
6. ✅ Complete Phase 3: Inventory
|
|
7. 🔄 Complete Phase 4: Tasks & Scheduling (MVP Deployed)
|
|
8. ✅ Start Phase 5: Advanced Batches
|
|
|
|
### Long-term (2-3 Months)
|
|
|
|
9. ✅ Complete Phases 7-9 (Reporting, Communications, Compliance)
|
|
10. ✅ Evaluate Phase 10 (Integrations & Hardware)
|
|
|
|
---
|
|
|
|
## 📝 **NOTES**
|
|
|
|
- All specs are complete and ready for implementation
|
|
- Database schemas are designed
|
|
- API endpoints are defined
|
|
- UI components are outlined
|
|
- Mobile-first approach throughout
|
|
- 777 Wolfpack branding consistent
|
|
- Accessibility compliance (WCAG 2.1 AA)
|
|
|
|
---
|
|
|
|
**Status**: Phase 1 & 1.5 complete. Phase 2 in progress. Ready to accelerate! 🚀
|