feat: Plant Touch Points & IPM Tracking Spec
📋 New Feature Spec from 777 Wolfpack Feedback
Requirements:
- Touch points system for every plant interaction
- Record data at each touch point (type, notes, photos)
- IPM schedule tracking (10-day root drench cycles)
- Pyganic 5.0 product tracking
- Mobile-first quick entry
- Alerts for IPM treatments
Database Design:
- PlantTouchPoint model (touch type, measurements, photos)
- IPMSchedule model (10-day intervals, auto-calc next treatment)
- TouchPointType enum (WATERING, FEEDING, IPM_TREATMENT, etc.)
UI Design:
- Quick action buttons for common touch points
- IPM schedule screen with alerts
- Photo capture
- Touch point history timeline
Priority: Phase 2 (after Daily Walkthrough)
Estimated: 17 hours (2-3 days)
Team: 777 Wolfpack
Status: Spec Complete - Ready for Phase 2