# 777 Wolfpack Grow Ops Manager - Complete Roadmap **Version**: 0.3.0 **Last Updated**: 2025-12-17 **Team**: 777 Wolfpack --- ## ✅ **PHASE 1: FOUNDATION** (COMPLETE) ### Sprint 1: Infrastructure ✅ - Backend health checks - Database setup (PostgreSQL + Prisma) - Docker deployment - Traefik routing - Redis integration ### Sprint 2: Authentication & RBAC ✅ - JWT authentication (access + refresh tokens) - Bcrypt password hashing - User roles (OWNER, MANAGER, GROWER, STAFF) - **Granular Permissions (Custom Roles)** ✅ - Login/logout - Protected routes ### Sprint 2.5: Mobile-First UI ✅ - Space Grotesk font (premium typography) - Emerald & Slate color scheme - SVG icons (Lucide React) - Smooth animations - Dark/Light/Auto theme toggle - Touch-optimized (44px+ targets) - Accessibility (WCAG 2.1 AA) - **Granular Navigation (Roles/Settings)** ✅ --- ## ✅ **PHASE 1.5: DAILY WALKTHROUGH** (COMPLETE) ### Database Schema ✅ - DailyWalkthrough model - WalkthroughSettings model (Configurable logic) ✅ - ReservoirCheck (4 tanks) - IrrigationCheck (4 zones) - PlantHealthCheck (4 zones) - 5 enums for status tracking ### Backend API ✅ - 7 endpoints (CRUD + checks) - Settings API (Dynamic Configuration) ✅ - JWT authentication - User attribution - Error handling ### Frontend UI ✅ - Start screen with 777 Wolfpack branding - Reservoir checklist (visual tank indicators) - Irrigation checklist (dripper tracking) - Plant health checklist (pest monitoring) - **Admin Settings Page (Photo Requirements/Toggles)** ✅ - Summary/review screen - Complete integration **Status**: ✅ **DEPLOYED & WORKING** --- ## 🔄 **PHASE 2: CORE OPERATIONS** (IN PROGRESS) ### 2.1: Plant Touch Points & IPM Tracking **Priority**: 🔴 Critical **Estimated**: 17 hours (2-3 days) **Features**: - Touch point recording (every plant interaction) - Touch types: Watering, Feeding, Pruning, Training, Inspection, IPM, Transplanting, Harvesting - IPM schedule tracking (10-day root drench cycles) - Pyganic 5.0 product tracking - Photo documentation - Alerts for IPM treatments **Database**: - PlantTouchPoint model - IPMSchedule model - TouchPointType enum **Spec**: `specs/plant-touch-points-ipm.md` --- ### 2.2: Photo Management & Storage **Priority**: 🔴 Critical **Estimated**: 7-11 hours **Features**: - Client-side compression (WebP, 80% quality) - Server-side multi-size generation (thumb/medium/full) - 85-90% storage reduction - Local storage with daily backups - 7-year retention for CA compliance **Tech**: - Sharp for server-side processing - browser-image-compression for client-side - 3 sizes: 200px, 800px, 1920px **Spec**: `specs/photo-management.md` --- ### 2.3: Grow Room Heatmap **Priority**: 🟡 High **Estimated**: 12-15 hours **Features**: - Visual heat-map of plant health - 2-level room layout (floor_1, floor_2) - Color-coded health scores (0-100) - Hover tooltips with bed details - Sensor data overlay (temp, humidity, EC, PAR) - SVG-based grid rendering **Components**: - GrowRoomHeatmap (main) - FloorGrid (SVG grid) - BedCell (individual beds) - BedTooltip (hover details) - FloorToggle (floor selector) - HealthLegend (color scale) **Spec**: `specs/grow-room-heatmap.md` --- ## 📦 **PHASE 3: INVENTORY & MATERIALS** **Priority**: 🟡 High **Estimated**: 30-40 hours (1-2 weeks) ### Features #### Item Catalog - Nutrients (base, additives, supplements) - Growing media (soil, coco, rockwool) - Pots and containers - IPM products (pesticides, beneficial insects) - PPE (gloves, masks, suits) - CO₂ tanks and regulators - Filters (carbon, HEPA) - Packaging (jars, bags, labels) - Tools and equipment #### Inventory Tracking - Add stock (deliveries with lot and cost) - Use stock (with batch linkage) - Adjust stock (with reason and approval) - Transfer stock (between locations) - Automatic updates (future: task completion) #### Restock Alerts - Min threshold alerts - Expiration alerts - Restock suggestions (usage trends) #### Lot/Serial Tracking - Link lots to batches (traceability) - Recall support (query batches by lot) - Supplier traceability #### Supplier Management - Supplier database - Contact information - Performance tracking - Purchase order history #### Shopping List - Low stock report - Restock suggestions - Cost estimates - Supplier recommendations #### Reporting - Current inventory - Low stock report - Usage report (by item, batch, period) - Cost report (per batch) - Expiration report **Database**: - InventoryItem model - InventoryLot model - InventoryTransaction model - BatchMaterialLink model - Supplier model - ItemCategory enum - TransactionType enum **Spec**: `specs/inventory-and-materials.md` --- ## 📅 **PHASE 4: TASKS & SCHEDULING** **Priority**: 🟡 High **Estimated**: 25-35 hours ### Features - **Unified Master Calendar**: - Toggles for: - Employee Schedules (Rooster) - Vacation Requests - Shift/Hours Logs - Vendor Deliveries/Meetings - Plant Cycle (Veg/Flower/Harvest dates) - Tax Schedule (Deadlines) - Compliance Matters (Inspections, renewals) - Task templating & assignment - Automatic stock deduction - Batch lifecycle integration - Notifications and reminders **Database**: - CalendarEvent model - EventType enum (SCHEDULE, VACATION, VENDOR, PLANT, TAX, COMPLIANCE) - Task model - TaskTemplate model - TaskAssignment model **Spec**: `specs/tasks-and-scheduling.md` --- ## 🌱 **PHASE 5: ADVANCED BATCH LIFECYCLE** **Priority**: 🟢 Medium **Estimated**: 20-30 hours ### Features - Batch creation and tracking - Growth stage management - Yield tracking and analytics - Batch notes and observations - Batch-to-batch comparisons - Harvest scheduling - Waste tracking **Database**: - Enhanced Batch model - BatchStage enum - BatchNote model - YieldRecord model **Spec**: `specs/batches-and-rooms.md` --- ## 📱 **PHASE 6: PWA & MOBILE** **Priority**: 🟢 Medium **Estimated**: 10-15 hours ### Features - Service worker (offline support) - Web manifest (Android APK) - Install prompt for Android users - Offline data sync - Push notifications - Background sync - App icons (192px, 512px) **Status**: ⏳ Manifest created, service worker pending --- ## 📊 **PHASE 7: REPORTING & ANALYTICS** **Priority**: 🟢 Medium **Estimated**: 20-25 hours ### Features - Dashboard with key metrics - Batch performance analytics - Cost analysis - Yield predictions - Environmental trends - Labor efficiency - Export to PDF/Excel --- ## 🔔 **PHASE 8: COMMUNICATIONS & NOTIFICATIONS** **Priority**: 🟢 Medium **Estimated**: 15-20 hours ### Features - In-app notifications - Email notifications - SMS alerts (critical issues) - Slack integration - Discord integration - Notification preferences - Alert escalation **Spec**: `specs/communications-and-notifications.md` --- ## 📋 **PHASE 9: COMPLIANCE & DOCUMENTATION** **Priority**: 🟢 Medium **Estimated**: 25-30 hours ### Features - Compliance checklists - Document management - Audit trail - Regulatory reporting - Certificate tracking - Inspection readiness - Export compliance reports **Spec**: `specs/compliance-and-docs.md` --- ## 🔌 **PHASE 10: INTEGRATIONS & HARDWARE** **Priority**: 🔵 Low **Estimated**: 30-40 hours ### Features - Environmental sensors (temp, humidity, CO₂) - Irrigation controllers - Lighting controllers - Security cameras - Access control - HVAC integration - Real-time monitoring **Spec**: `specs/integrations-and-hardware.md` --- ## 🎯 **QUICK WINS** (Can be done anytime) ### Error Handling - ErrorBoundary component - 404 page - Network error handling - Form validation - API error messages ### UI Polish - Loading skeletons - Empty states - Success animations - Error animations - Toast notifications ### Performance - Code splitting - Lazy loading - Image optimization - API caching - Database indexing --- ## 📊 **ESTIMATED TIMELINE** | Phase | Status | Estimated Time | Priority | |-------|--------|----------------|----------| | Phase 1: Foundation | ✅ Complete | - | - | | Phase 1.5: Daily Walkthrough | ✅ Complete | - | - | | Phase 2: Core Operations | 🔄 In Progress | 36-41 hours | 🔴 Critical | | Phase 3: Inventory | 📋 Spec'd | 30-40 hours | 🟡 High | | Phase 4: Tasks & Scheduling | 📋 Spec'd | 25-35 hours | 🟡 High | | Phase 5: Advanced Batches | 📋 Spec'd | 20-30 hours | 🟢 Medium | | Phase 6: PWA & Mobile | ⏳ Started | 10-15 hours | 🟢 Medium | | Phase 7: Reporting | 📋 Spec'd | 20-25 hours | 🟢 Medium | | Phase 8: Communications | 📋 Spec'd | 15-20 hours | 🟢 Medium | | Phase 9: Compliance | 📋 Spec'd | 25-30 hours | 🟢 Medium | | Phase 10: Integrations | 📋 Spec'd | 30-40 hours | 🔵 Low | **Total Remaining**: ~211-276 hours (~5-7 weeks at 40 hours/week) --- ## 🎯 **RECOMMENDED NEXT STEPS** ### Immediate (This Week) 1. ✅ Complete Phase 2.1: Touch Points & IPM 2. ✅ Complete Phase 2.2: Photo Management 3. ✅ Complete Phase 2.3: Grow Room Heatmap ### Short-term (Next 2 Weeks) 4. ✅ Complete Phase 6: PWA & Mobile 5. 🔄 Complete Phase 3: Inventory & Materials (Shopping List MVP Done) ### Medium-term (Next Month) 6. ✅ Complete Phase 3: Inventory 7. 🔄 Complete Phase 4: Tasks & Scheduling (MVP Deployed) 8. ✅ Start Phase 5: Advanced Batches ### Long-term (2-3 Months) 9. ✅ Complete Phases 7-9 (Reporting, Communications, Compliance) 10. ✅ Evaluate Phase 10 (Integrations & Hardware) --- ## 📝 **NOTES** - All specs are complete and ready for implementation - Database schemas are designed - API endpoints are defined - UI components are outlined - Mobile-first approach throughout - 777 Wolfpack branding consistent - Accessibility compliance (WCAG 2.1 AA) --- **Status**: Phase 1 & 1.5 complete. Phase 2 in progress. Ready to accelerate! 🚀